The samples averaged 14 g/t !!I am looking forward to the opening of this mine. This can be huge.
"Lion One has advanced the number 2 development drive by over 250 meters and has completed the first cut of high-grade material from the URA1 lode. The samples taken from this first cut averaged 14 g/t gold and are designated for the high-grade ROM stockpile. "