In the mean timeKeep the faith. Consider, for $30,000,000.00 cash flow pre cost like about $100.00 per ton and taxes:
$30,000,000.00 in copper. If we get $3.00 per lb. we need 10,000,000 lbs.
At 10% copper, thats 200 lb per ton and that is 50,000 tons.
At factor of 12 cu feet per ton, thats 600,000 sq feet.
That is an area 100 feet by feet by 100 feet by 60 feet..
Just on the decline we were striking 10 % copper.
We have 27 feet of 41% copper.
We are looking at an area of 700feet by 200 feet that has been drilled at depth and open in all directions but up.
We have one drill hole of 300 feet of 1% copper.
We have a near by mill that has already successfully done the test concentrate sample.
We can do close circuit floatation for copper.
We are looking at direct shipping of copper.
We are producing gold. and are now with the decline targeting higher AU zone.
We have dealt with and are still dealing with suprises like insecure ground that has forced detours and delays.
Compared to other juniors we have done fantastic. It could have been quicker, I assume, but all this progress with most other juniors would have been a LOT longer, especially with the given budget and share float of 21m.
Do we get $30 m in copper , maybe. Maybe we will get more.
IT SEEMS TO HAVE GONE COMPLETELY UNNOTICED, WE HAVE A WORKING MINE AND CASH FLOW!