RE: RE: Madison Mining Co. Introductory VideoGreat posting!
But, the video indicates $110.00 total mining and milling cost per ton.
I can not recall such low costs!
As I recall we have previously come in at $367.00 per ton.
That is a big difference and hope we can achieve some cost reduction.
We have about 22,000 AU non 43-101 @ about 40,000 tons.
If Eugene cab shave of another $100.00 per ton, that's added
profit of $4,000,000.00. Probably way too much to expect but the point is
how much the bottom line can be altered with good mgm and cost reduction.
Eugene has shown he is the Man that can do it, if it can be done.