Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Luca Mining Corp V.LUCA

Alternate Symbol(s):  LUCMF

Luca Mining Corp. is a Canada-based mining company operating in Mexico that engages in exploration, development and operation of polymetallic mineral resource projects in Mexico. It offers a portfolio of two advanced projects: Tahuehueto and Campo Morado. The Company's Tahuehueto Gold Mine Project is in north-western Durango State, Mexico where construction of an initial 500 tons per day (tpd) operation is well advanced. The commercial production, the 1,000 tpd project, shall follow immediately after commissioning the initial stage. The operation is generating gold, silver, lead and zinc in concentrates. Its Campo Morado is an operating polymetallic base and precious metals mine producing at an average of 2,400 tpd, generating zinc and copper concentrates with significant precious metals credits.


TSXV:LUCA - Post by User

Post by aberlangaon Apr 05, 2022 11:23pm
124 Views
Post# 34579092

Tahuehueto

Tahuehueto Thank you very much for showing, even a single image, the status of the construction of Tahuehueto.
In this image, very concentrated in the mill, as is announced, the first mill  is already in place, however, the electrical installation to provide it with energy, the hydraulic installation for the water supply and the lubrication system and control of the engine and power system is not observed.
Considering that the start-up and pre-production tests are imminent, I would appreciate it if you would answer the  following questions to investors and, if possible, photographs showing their status;
  1. The existing mine preparation and development works guarantee a constant production of ore at the projected 500 tpd with good grade?
  2. How many tons of ore are stored outside of the mine to ensure continuous start-up and production?
  3. Are there already trained personnel, equipment, and facilities in the mine to ensure uninterrupted ore production?
  4. Is the crushing area already installed and tested?
  5. Is the fine ore hopper already finished and filled with crushed ore from the crushing system tests?
  6. Is the mill's power system complete and when will it be installed and tested?
  7. When will the electrical and hydraulic installation of the mill be ready and tested?
  8. Is the electrical and hydraulic power supply ready on the thickener, flotation, filters of concentrates and tailings already installed?
  9. Can the tailings dam already receive dried tailings?
  10. The water supply is already guaranteed, will it be supplied from the mine development at the level of the river and / or from the works of the mine?
  11. Is the metallurgical laboratory already completed and operating with personnel?
  12. Is the electric power supply system for the mining unit already tested and operated or will it start with temporary equipment?
  13. Are the motor control centers already finished and tested?
  14. Are warehouses, workshops and offices already completed and with equipment and parts to operate the mine?
  15. When do you expect to start testing the plant with ore?
One or more photographs of these areas will help a lot to ratify that Tahuehueto will soon be a reality and that the value of the company will take its rightful place.....