2018 Drill Program Slated for Late Summer/Fall"NAM plans to initiate a diamond drilling program on the newly discovered high-grade Pine Zone to contribute to early PEA work that will be performed by P&E. P&E will use all previous NI 43-101 compliant Mineral Resource data, the 2018 Abitibi Geophysical report, the reinterpretation of Abitibi Geophysical reports by Alan King, P.Geo our Sudbury Geophysical consultant as well as the 2018 Summer/Fall drilling Results to determine a target mine size for the potential starter open pits in the northern 16 kilometres of mineralization. From this target size, P&E will be able to generate early and advanced mine production scenarios including a mine production schedule. The PEA is scheduled to be completed on or before the end of the first half of 2019."
https://ceo.ca/@thenewswire/new-age-metals-engages-pe-mining-consultants-inc-to