RE:RE:New Placer Dome going to rerate huge in 2021 Actually i'm seeing drill numbers of 17,790' drilled ,,, IE:
New Placer Dome has advised the company that a total of 17,970 metres (58,956.7 feet) were drilled at Kinsley Mountain in the 2020 drilling program, consisting of 39 reverse circulation (RC) drill holes totalling 13,610 metres (44,652 feet) and 10 diamond drill core holes totalling 4,360 metres (14,304 feet). Samples are being processed at the ALS Geochemistry laboratory in North Vancouver, B.C. Analytical results from the program are pending, and will be released when received, compiled and interpreted.
so that was a pretty large drill program!!
and from the NEV NR today, even though they had some real struggles with the 2 drill holes they attempted.. their sp is being held up and i would say it is by the Kinsley Mountain drill results... at least that is my bet !