Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Oroco Resource Corp V.OCO

Alternate Symbol(s):  ORRCF

Oroco Resource Corp. is a Canadian mineral exploration company focused on the assembly of mineral concessions which make up the Santo Tomas porphyry copper project in Sinaloa State, Mexico. The Santo Tomas project is a copper porphyry deposit defined by 106 diamond drill and reverse circulation drill holes totaling approximately 30,000 m.


TSXV:OCO - Post by User

Post by Copperking102on Sep 16, 2022 9:02pm
375 Views
Post# 34968485

Teck and Agnico-Eagle Form JV @ San Nicolas

Teck and Agnico-Eagle Form JV @ San Nicolas
San Nicols Project Highlights
  • Located in Zacatecas, a major mining state in Mexico, with significant geological potential and numerous poly-metallic and precious metals opportunities. In addition, Zacatecas has excellent access to infrastructure and a skilled workforce
  • San Nicols is the largest undeveloped volcanic-hosted massive sulfide deposit ("VHMS") deposit in Mexico and is one of the largest undeveloped VHMS deposits globally. As at December 31, 2021, Teck estimated San Nicols to contain 105.2 million tonnes of proven and probable mineral reserves at average grades of 1.12% copper, 1.48% zinc, 0.4 g/t gold and 22 g/t silver, or more than 2.0% on a copper equivalent basis
  • Prefeasibility study completed by Teck in March 2021 describes attractive economics and project parameters:
    • The project contemplates a modern truck-and-shovel open pit, processing, and flotation operation
    • First production expected in 2026, with an estimated mine life of 15 years and meaningful potential for mine life extension and regional exploration upside
    • Expected to produce 63 thousand tonnes per annum (ktpa) of copper and 147 ktpa of zinc in concentrate over its first five years of production
    • Average life of mine head grades of 1.13% copper and 1.49% zinc
    • Average C1 operating costs of US$(0.16)/lb copper and US$0.44/lb copper over the first five years of production and life of mine, respectively, net of by-products
    • US$842 million development capital cost estimate
    • 2.6 year payback and 33% after-tax Internal Rate of Return (IRR) based on US$3.50/lb copper and US$1.15/lb zinc
<< Previous
Bullboard Posts
Next >>