RE:RE:RE:Malte on Oroco South Zone Drill Results (OCO, ORRCF)People just don't understand where this is going and the value it will bring to the table. Look what's happening...The historical pit and Thornton study is being confirmed and growing. That number as i recall was estimated to be approx 600 M tons. Now, we're seeing additional lengths with similar grades in the South Zone. Way early, but looks like additional tonnage of size will easily be achieved. So, that brings us to 700-750 million tons, quite possible, which would equate to 14-15 billion lbs. Recently there was a deal with Teck and Agnico which valued the deposit at $.13 lb in situ. Do the math...$1.6-$1.75 billion....And remember, lots of infrastructure already in place, or nearby...