pomme214 on Jan 23, 2021 11:49am
Drilling should proceed for most of the winter months.
A drill rig is expected to be mobilized in the field on 12th of January 2021', All pieces of the puzzle are now in place to start the 5,000m drilling program on Noyell property, next January. Permitting is completed. Road, water accesses and drill sites are identified and will be developed in early January. A drill rig is expected to be mobilized in the field on 12th of January 2021 with drilling starting soon after. Drilling should proceed for most of the winter months. This is a very important step for the company as those drill targets are considered to be extremely promising as a follow-up to the significant gold results obtained in March 2020, just before Covid-19 stopped all work. Eight holes will investigate the 2020 discovery area while 5 holes will test IP anomalies located from 0.5 to 3 km east of drill hole NO-20-02. 9e5b1afe-5cfd-475b-b878-5c56693edee3 (600×396) (globenewswire.com)
casa_detour_googleearth_29avril2015.pdf (gfk-resources.s3.amazonaws.com)
casa_allageprop_age_29avril2015.pdf (gfk-resources.s3.amazonaws.com)
good luck on that Drill program so many deposit around :)
pom !
Be the first to comment on this post