Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Bullboard - Stock Discussion Forum PMI RESOURCES LTD V.PMI

"Petromanas Energy Inc is an international oil and gas company. The Company is engaged in the acquisition, exploration and evaluation of oil and gas properties in Albania, France and Australia."

TSXV:PMI - Post Discussion

PMI RESOURCES LTD > still a huge opportunity for 8 un-tested zones as PLT shows
View:
Post by Tikorangi on Apr 12, 2018 9:27am

still a huge opportunity for 8 un-tested zones as PLT shows

Before you throw in the towel, read what it is actually saying...

You need to understand a-g below from a reservoir engineering perspective

a) Why is a well in Colombia named after a capital city - see prior block owners from turkey. 

b)  12 separate intervals covering a total thickness of 62.4 feet were selected
c)   Six of the perforated intervals were shot 
d)   remaining perforations targeted a lower sand package 
e)   although steady state conditions were never achieved
f)    350,000 cubic feet of gas per day and 2,100 barrels of water 
g)   accumulated water in the well was impeding the gas flow
h)   eight potential gas zones were not properly flow tested
i)    weight of the water column in the wellbore which severely limited our         ability to achieve sufficient drawdown to initiate gas flow 
j)  to secure a workover rig
or coiled tubing, with the intent of isolating the water producing intervals in order to flow test the other (2) potential gas bearing zones independently.

i will get back to the board after learning more about a-g from peers

to stress, the language of this release is very technical and each word is carefully chosen and has deep meaning as to what occured and what is coming up next. very encouraged that they are planning to isolate w/ coil to test the other zones, which will give steady state conditions.


PentaNova Energy Provides an Update on the Testing of Istanbul-1
04/11/2018 

VANCOUVER, Apr 11, 2018 (Canada NewsWire via COMTEX News Network) -- PentaNova Energy Provides an Update on the Testing of Istanbul-1

PentaNova Energy Corp. (the "Company") (TSXV: PNO), is pleased to provide an update on the testing of the Istanbul-1 well ("the well").

The well, located in the Maria Conchita block in northern Colombia, commenced drilling on February 27, 2018 and reached a total depth of 8,740 feet measured depth ("MD") on March 21(st). When drilling through the Jimol formation indications of gas were seen and open hole logs, run between March 21(st) and March 24(th) revealed 88.5 feet of low resistivity, potential gas bearing sands with good reservoir properties.

Based on the interpretation of the open hole logs and mud log, 12 separate intervals covering a total thickness of 62.4 feet were selected and perforated for testing. Six of the perforated intervals were shot over an upper sand package at depths of between 7,912 feet MD and 8,122 feet MD, while the remaining perforations targeted a lower sand package at depths of between 8,429 feet MD and 8,608 feet MD.

From April 06 to April 10, 2018, the well was flow tested with gas and water produced to surface. The well was cleaned up for 33 hours and although steady state conditions were never achieved, the well was flowed through the test separator for a period of 7 hours at an average rate of 350,000 cubic feet of gas per day and 2,100 barrels of water per day with an average salinity 18,200 ppm chlorides. After 14 hours flowing, the accumulated water in the well was impeding the gas flow. A production log ("PLT") was subsequently run confirming that the majority of water and gas production was coming from four zones with 26 feet of perforations in the upper sand package. The PLT also confirmed that the other potential gas bearing zones (eight zones with 36.4 feet of perforations) were not contributing materially to the observed flow, being impeded by the weight of the water column in the wellbore which severely limited our ability to achieve sufficient drawdown to initiate gas flow from these zones.

Given the PLT results, which indicate that eight potential gas zones were not properly flow tested, the Company plans to secure a workover rig or coiled tubing, with the intent of isolating the water producing intervals in order to flow test the other (2) potential gas bearing zones independently.

The drilling rig was released on April 9(th).

Be the first to comment on this post
The Market Update
{{currentVideo.title}} {{currentVideo.relativeTime}}
< Previous bulletin
Next bulletin >

At the Bell logo
A daily snapshot of everything
from market open to close.

{{currentVideo.companyName}}
{{currentVideo.intervieweeName}}{{currentVideo.intervieweeTitle}}
< Previous
Next >
Dealroom for high-potential pre-IPO opportunities