Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Red Mile Minerals Corp V.RDM



TSXV:RDM - Post by User

Bullboard Posts
Comment by jayjay0on Feb 05, 2004 10:09pm
119 Views
Post# 7010799

RE: question mm15

RE: question mm15and I guess I should say any one interested in Rhonda. Bashers and halcrow bashers need not read on. This is a earlier post from farky. " Jump to RDM Forum SUBJECT: Incredibly interesting read.... Posted By: farky Post Time: 1/27/04 22:59 « Previous Message Next Message » I found this in Debeers Canada's water application for the Knife project this year. I would recommend you read the whole article. Just do a google search to find the article. Drill Programme 2004 – Crown Land In spring 2004 (approx. 01 March to 01 May), a 25-hole drill programme producing the equivalent of PQ-diameter (10-11cm) diameter core is planned at Knife Lake; the objective is to recover up to 100t of kimberlite from the Knife Lake kimberlite pipe. Two drills, such as Boart Longyear’s LF-70 hydraulic core rig (the same model as used for several programmes on DBCE’s Rockinghorse property, cf. Appendix 2A) would be deployed concurrently; at 9 000kg, this is a lightweight fly rig. There also is the possibility of use of Boart Longyear’s larger (17 300kg) gear-driven LY-50 core drill modified for fly operation (Appendix 2B). The proposed campsite is approximately 2.3km away from the drillsite area, within easy reach by fixed-wing or helicopter. Kimberlite core recovered would be flown off-site by fixed-wing aircraft. Drill Programme 2005 – Crown Land Should results from the 2004 programme indicate that further (i.e., larger-volume) evaluation of the Knife Lake kimberlite is warranted – to gain additional information on diamond grade and stone distribution – DBCE might consider a combination of large-diameter drilling (with either a production rig alone to do both casing and sample recovery, or with both a large-diameter casing rig and a production rig) and mechanical land-based trenching. Trenching would be considered where the Knife Lake kimberlite pipe subcrops to land. Drilling methodology similar to that used at DBCE’s Kennady Lake (Gahcho Kué) Project, NWT, in 2001-2002 would be employed, i.e., reverse-circulation air-assist production drilling which lowers the incidence of stone breakage typically encountered with reverse-circulation (water) alone. Neither the location of large-diameter holes (LDDH) nor length/orientation of trenches can be determined at this time. It should be noted that plans beyond 2004 are necessarily highly speculative and subject to change, depending on results and year-to-year budgets; whilst a programme may prove successful, there is also the possibility that a programme may prove unsuccessful, which is a disincentive to further work. INAC, other Regulators and Kitikmeot residents, principally of Kugluktuk, shall be kept fully apprised as plans evolve. « Previous Message Next Message »
Bullboard Posts