Comment by
TurnToTheRight on Sep 03, 2021 12:31am
I very much doubt that it will be that quick. I would guess that they will complete the 2D seismic, pick the best possible location based on all available data (2D, VSP, correlation to cores and logs) and drill a new well to production test. RECO will want the best possible production numbers to trot out to potential JV parties or partners, and not just good numbers from an existing well.
Comment by
Sandpoint on Sep 03, 2021 12:48am
They have stated in PR and in the release last night that end of October for the the seismic to be all done and analyzed. By the time they pick the site, get it prepared and moved the drill to the site, I figure drilling starting a december, with result early in 2022. I suspect they will take their time to make sure they get things done right.
Comment by
crude on Sep 03, 2021 8:48am
From the NR - Please read - states when they will re-enter the well for PRODUCTION testing ,this could be any day Once the results of the vertical seismic profile and 2D seismic data on the 6-2 well are complete, the Company will make a decision on production testing.