lets reap the rewards
Pipeline Projects:
Adi Rassi
– 15.77 Mt (Inferred) resource at 0.54% Cu and 0.33 g/t Au
Kodadu Gold Target
– (Inferred) resource of 990,000 tonnes with an average
grade of 1.24 g/t Au & 1.6 g/t Ag
although these posts run counter point for the charlatans and chameleons that post regularly the following is why they strive to shake the tree. your tree.
Filing Services Canada July 17, 2014
Executive Office:
1
490
-
1
075
W
Georgia
Street
Vancouver,
BC,
Canada V6E 3C9
T:
604 688 9478 / F:
604 688 9458
Investor Relations:
Greg Davis
T: 604 688
1
263
Email: greg@sunridgegold.com
Share Structure:
September 2
0
1
4
Shares Outstanding:
2
1
0 million
Fully Diluted Shares:
3
1
0 million
Market Cap:
CDN ~$45 million
Phase 1:
DSO and Gold Production (Year 1 – Year 5)
Phase 1A:
DSO (Year 1 – Year 2)
• Mining of 116,000 tonnes of high-grade DSO with an average grade of
1
5.6% Cu, 2.96 g/t Au and 76.8 g/t Ag from Debarwa
• Crushing at Emba Derho and shipping to smelter; mine and ship in
6 months
Phase 1B:
Gold Production (Year 1 – Year 5)
• Mining of the 3.0 million tonnes near-surface gold “caps” at Debarwa and
Emba Derho followed by Gupo Gold
• Process at gold heap-leaching operation near the Emba Derho deposit at
a rate of
1
.4 million tonnes per year
Phase 2:
Supergene Copper Production (Year 2 – Year 3.25)
• Mine and process by flotation 2.4 million tonnes of high-grade copper
supergene ore from Debarwa and Emba Derho at rate of 2 million tonnes
per year for
1
.25 years
Phase 3:
Full Production (Year 3.25 – Year 16.3)
• Mine and process by flotation
5
1
.0 million tonnes of primary copper and
zinc ore from Emba Derho, Debarwa and Adi Nefas at a rate of 4 million
tonnes per year for
1
3 years
• Adi Nefas to be mined using underground long hole bench retreat ranging
between
1
50,000 and 470,000 tonnes per year for a total of
1
.682 million