Hydraulic Fracturing at well Karlavskoye 101, Ukra
*The objective is to achieve initial production above 10 mmcf/d (280,000m3/d) and to put the well on production into the adjacent pipeline at a continuous stable rate around 4 mmcf/d (140,000m3.d) for one year to assess reservoir performance. *
Taken from * Latest Investor Summary at Karl 101 * from Transeuro webside
I think the objective this time is very conservative. Didn't we get 10 mmcf/d from the bottom reservoir alone before the had the leak?
Will fracking overcome the troubles caused by drilling mud in all zones ?