WAPP 2014 Was curious about timing of hydro corridor from Ghana and found this on World Bank site and confirmed on WAPP site that it is "commissioned" for 2014:
"These challenges are being addressed by the broader development of the West African Power Pool (WAPP), designed to generate economic benefits by improving the power grid and creating a regional electricity market for member states. The extension of the Cote d’Ivoire-Bobo-Dioulasso transmission line to Ouagadougou, financed by the Energy Sector Development Project, serves as a launch pad for this regional integration initiative. The Ouagadougou region’s power supply will gain a greater mix and reliability from then hooking up Ouagadougou with Bolgatanga (Ghana) via the abovementioned interconnection. This connection is due to be operational in 2014."