RE: NEWS OUT!!!!Drill the first six holes at Las Bolas then move five kms to drill six holes at the old Flor del Trigo mine while the first six holes are being assayed and then move back to Las Bolas for the final six holes?
Why that's pretty smart. It appears Mr. Sorbara is positioning the company with options to modify the final holes of the program based on the results of the first six. Maybe even add an additional hole or two? You know, while the boys are still around.
It took a long time to get a good drilling contractor with the right equipment for this job. Might as well get the most out of them while.