GREY:GEYEF - Post by User
Comment by
lemoosemanon Mar 04, 2006 8:35am
120 Views
Post# 10458183
RE: GGY drills 36.4 g/t over one metre at BigDome
RE: GGY drills 36.4 g/t over one metre at BigDome At depth these 2 hi grade veins, with the lower grades between,will probably converge to form a larger system with higher grades .This is why the saerch is on for a bigger drill.