OTCPK:STOSF - Post by User
Post by
1bearon May 06, 2006 2:23pm
191 Views
Post# 10806326
more......
more......NSC “Chornomornaftogaz” owns:
- technological fleet consisting of 22 vessels
- 2 self-elevating floating drilling rigs “Sivash” and “Tavrida”
The company has a highly-qualified personal for implementation of the whole complex of works. The Company’s staff is 3500 people.
The development strategy of NSC “Chornomornaftogaz” for the period till 2010 provides:
- construction and put into operation 11 new fields, opened and perspective ones including;
- drilling of 50 production wells, construction of 3 offshore fixed platforms, 9 block-conductors; lay of 459 km offshore gas-pipelines;
- use of UAH 2,3 bln. of capital investments for construction of new fields, including exploitation drilling – UAH 806,6 mln, construction of new objects – UAH 1514,7 mln;
- gas will stay a principle type in the structure of hydrocarbons production. A maximum designed level of natural gas production till 2010 will be 2,7 bln.m3 which increases the figures of 2002 in 3,3 times;
- in 2003-2010 it is planned to produce totally 13,4 bln.m3 of natural gas, 562 thousand tons of gas condensate and 73 thousand tones of oil;
- the project of gas-refinery plant’s construction provides obtaining of 150 tones of oil products daily in kind of liquefied gas of propane-butane fraction, stable gas fuel and raw materials for diesel oil;