from sabina web-site re: DEL NORTE
Notes dated may 06 from sabina web-site
Corporate Notes-Del Norte (May - 06)
* In-house geology and engineering work ongoing
* Drilling to recommence in July, 2006 after initial
prospecting and ground truthing.
* Emphasis on steptout work to determine potential tonnage and grade in the K-Zone area (0.2 oz/t gold and 19 oz/t silver over 33 ft on surface; 2 oz/t gold and 110 oz/t silver at 400ft vertical depth below).
* Test additional targets including large EM anomaly in the vein wall.
* Advance Del Norte to resource estimate stage.