OVER 100,000 additional tons ofore from today's release. Each deposit increased by about 5000 sq. meters and one is 2.16 meters thick and the other 3.4 meters thick. Thus 5,000 times 5.56 meters is 27,800 cubic meters. Given the specific gravity of this type of lead/zinc ore is about 3.8 that gives 27,800 times 3.8 resulting in 105,640 tons of ore.
AT US$750 per ton that is $80,000,000 of ore. Given the high grade nature of the ore, a lot of the value will be turned into profit. This stock just keeps getting cheaper and cheaper.