Get ready to ruuuuuuuuuummmmmmblllllllle !At the AGM Steve Leary mentioned that the co could tell from the grain in the drill core the grade or dip of the rock holding the ore .
The grade was the same in both holes that the 63 hole is to scissor . This implied that the zone was the same and continuous . He actually thought it was a non event . How ever it will cut through a large block of rock .
That hole was completed around the 21 . Would it be possible to have it assayed by now ? Perhaps the other 2 holes will be out this week .
This is getting to be exciting for me to say the least !
jack