newsScorpio's Drilling of the Hoag Zone Discovery at depth includes 43.70 metres grading 65.31 g/t Ag, 3.84% Zn, 0.21% Cu, 2.27% Pb and 0.03 g/t Au
09:00 EDT Tuesday, July 11, 2006
TSXV:SPM
VANCOUVER, July 11 /CNW/ - Scorpio Mining Corporation (TSXV:SPM) is pleased to announce additional drill results from the Hoag Zone, a newly discovered, large mineralized body adjacent to the Nuestra Senora deposit.
Exploration drilling of an area previously thought to be barren has returned some very wide intersections of mineralization. Assay results for six holes drilled from the 6th Level crosscut (including 2 previously reported) are presented in Table 1. Twelve holes testing this zone from the 9th Level, located 75 metres vertically below, have intersected similar style and widths of mineralization. Assay results have been received for the first 2 holes drilled from the 9th Level as presented in Table 2. Drilled at approximately right angles to the zone, the intersections from these 2 holes are considered to approximate the true width at this location.
Peter J. Hawley, President, CEO reports, "This is the first new discovery of a major mineralized body on the property since ASARCO was actively mining the Nuestra Senora,Santo Domingo and Candelaria deposits in the 1960s. It is opportunely located just 20 metres north of the ramp, and is readily accessible for development and exploitation. The drill is now located in an underground drill bay between the 8th and 9th Levels and is continuing to evaluate the extent of this exciting discovery."
<<
TABLE 1. Hoag Zone Drill Results - 6th Level; Drill Station 6
-------------------------------------------------------------------------
Hole No. Dip From To Length Ag Au
(Deg) (m) (m) (m) (g/t) (g/t)
-------------------------------------------------------------------------
NS-UG-06-63* -58 58.50 61.20 2.70 31.52 0.07
-------------------------------------------------------------------------
93.00 150.00 57.00 66.86 0.06
-------------------------------------------------------------------------
NS-UG-06-64* -54 106.50 176.70 70.20 84.29 0.08
-------------------------------------------------------------------------
192.00 193.90 1.90 109.37 0.11
-------------------------------------------------------------------------
NS-UG-06-65 -65 73.20 133.00 59.80 44.27 0.07
-------------------------------------------------------------------------
Including 73.20 99.00 25.80 59.83 0.08
-------------------------------------------------------------------------
Including 113.00 121.50 8.50 75.65 0.12
-------------------------------------------------------------------------
NS-UG-06-66 -75 74.00 92.00 18.00 116.36 0.17
-------------------------------------------------------------------------
Including 74.00 81.00 7.00 111.63 0.19
-------------------------------------------------------------------------
Including 83.00 92.00 9.00 106.89 0.12
-------------------------------------------------------------------------
109.90 117.40 7.50 58.51 0.12
-------------------------------------------------------------------------
NS-UG-06-67 -45 165.00 171.00 6.00 212.10 0.05
-------------------------------------------------------------------------
NS-UG-06-68 -90 62.80 87.00 24.20 33.12 0.07
-------------------------------------------------------------------------
Including 62.80 67.50 4.70 45.34 0.09
-------------------------------------------------------------------------
Including 78.40 80.80 2.40 67.67 0.14
-------------------------------------------------------------------------
Including 83.00 87.00 4.00 95.00 0.19
-------------------------------------------------------------------------
--------------------------------------------
Hole No. Cu Pb Zn
% % %
--------------------------------------------
NS-UG-06-63* 0.03 1.38 2.13
--------------------------------------------
0.23 2.61 3.23
--------------------------------------------
NS-UG-06-64* 0.28 2.19 3.26
--------------------------------------------
0.58 3.28 4.25
--------------------------------------------
NS-UG-06-65 0.12 2.04 2.30
--------------------------------------------
Including 0.16 3.07 3.54
--------------------------------------------
Including 0.20 2.81 3.80
--------------------------------------------
NS-UG-06-66 0.11 1.98 1.65
--------------------------------------------
Including 0.10 2.77 3.23
--------------------------------------------
Including 0.10 1.33 0.49
--------------------------------------------
0.15 2.24 3.73
--------------------------------------------
NS-UG-06-67 0.48 3.90 0.97
--------------------------------------------
NS-UG-06-68 0.06 1.57 2.44
--------------------------------------------
Including 0.05 2.23 3.82
--------------------------------------------
Including 0.21 3.25 6.02
--------------------------------------------
Including 0.16 4.52 6.31
--------------------------------------------
>>
* Previously reported.
Note: Drill hole NS-UG-06-67 had to be abandoned within mineralization at
171 metres due to stuck drill rods. Drill hole data reflect down hole
core lengths and actual (uncut) grades. True widths cannot be reliably
estimated at this time.
<<
TABLE 2. Hoag Zone Drill Results - 9th Level; Drill Station 980
-------------------------------------------------------------------------
Hole No. Dip From To Length Ag Au
(Deg) (m) (m) (m) (g/t) (g/t)
-------------------------------------------------------------------------
NS-UG-06-69 -55 9.90 14.40 4.50 32.96 0.06
-------------------------------------------------------------------------
20.00 21.70 1.70 32.06 0.03
-------------------------------------------------------------------------
31.00 78.80 47.80 60.53 0.07
-------------------------------------------------------------------------
Including 47.00 78.80 31.80 75.34 0.07
-------------------------------------------------------------------------
Including 75.00 78.80 3.80 166.53 0.12
-------------------------------------------------------------------------
NS-UG-06-70 -66 34.90 78.60 43.70 65.31 0.03
-------------------------------------------------------------------------
Including 34.90 54.20 19.30 91.30 0.03
-------------------------------------------------------------------------
Including 60.00 78.60 18.60 58.40 0.03
-------------------------------------------------------------------------
--------------------------------------------
Hole No. Cu Pb Zn
% % %
--------------------------------------------
NS-UG-06-69 0.04 1.57 3.33
--------------------------------------------
0.15 1.24 1.74
--------------------------------------------
0.25 1.56 3.25
--------------------------------------------
Including 0.31 1.77 4.14
--------------------------------------------
Including 0.41 4.03 10.68
--------------------------------------------
NS-UG-06-70 0.21 2.27 3.84
--------------------------------------------
Including 0.27 3.22 4.56
--------------------------------------------
Including 0.22 1.97 4.31
--------------------------------------------
>>
Drill hole data reflect down hole core lengths and actual (uncut) grades.
True widths are estimated to approximate down hole lengths.
Preliminary plan and longitudinal sections showing the location of the new zone relative to the Nuestra Senora deposit and underground workings is available on the Scorpio Mining web site at:https://www.scorpiomining.com/s/NuestraSenora.asp.
Vice President, Exploration & Development, Mr. D. Roger Scammell, PGeo, is the Company's Qualified Person for the Nuestra Senora project. Mr. Scammell is responsible for the current exploration and development program and the preparation of all technical information provided in this release. All technical information for the Nuestra Senora property is obtained and reported under a formal quality assurance and quality control (QA/QC) program. Samples are shipped to the ALS Chemex preparation laboratory in Hermosillo,Mexico for drying, crushing and pulverizing. ALS Chemex, Hermosillo then sends the pulps by air-freight to ALS Chemex, Vancouver for assaying. Systematic assaying of standards and blanks are performed for precision and accuracy; check assays are regularly conducted by SGS Lakefield Research. Details of the QA/QC program are available on the Company's website atwww.scorpiomining.com.
ON BEHALF OF SCORPIO MINING CORPORATION
Peter J. Hawley
President & CEO
The TSX Venture Exchange does not accept responsibility for the adequacy
or accuracy of the content of this news release. This discussion includes
certain statements that may be deemed "forward-looking statements". All
statements in this discussion, other than statements of historical facts,
that address future exploration drilling, exploration activities and
events or developments that the Company expects, are forward looking
statements. Although the Company believes the expectations expressed in
such forward-looking statements are based on reasonable assumptions, such
statements are not guarantees of future performance and actual results or
developments may differ materially from those in forward-looking
statements. Factors that could cause actual results to differ materially
from those in forward-looking statements include metal prices,
exploration successes, continued availability of capital and financing,
and general economic, market or business conditions.
For further information: Glenn Little, Jackson Little Holdings Ltd: (604)930-4375, 1-888-930-4375, Email: jlconsulting@telus.net; Rich Kaiser, YES International: 1-800-631-8127, 001-757-306-6090 (outside North America), Email: yes@yesinternational.com
SPONSORED LINKS
Free Penny Stock Picks
Free report covering hot stock picks & tips ready to rocket your pocket book to the bank. Penny stocks, new issues, undervalued & undiscovered situa...
www.RocketStockPicks.com
Trade with FOREX.com
Sign up for a free $25,000 practice account. Advanced trading platform with real-time quotes, charts, news, research. Mini accounts from $250. No ...
www.forex.com
Offshore Banking, Tax Havens and Global Investing
Free online financial newsletter to explain the benefits. Learn to invest, bank, and protect your assets and privacy offshore. Edited by a former US ...
www.sovereignsociety.com
Looking for Superior Returns in Emerging Markets?
Then look to Eurasian Private Equity Group for great investment opportunities in Eastern Europe. Realize superior returns, capital appreciation, attr...
www.eurasianequity.com
Find $65,000+ Jobs in Technology and Business!
We have Development, IT, Analytical, Consulting, and Database related positions with many located in Canada available now. Membership is FREE, click ...
www.itfaction.com
Buy a link Now