drillingI spoke to the IR person today and was advised of the following
1. The drill will be on location by end of week (for sure)at which time a news release will be issued.
2. They will drill 5 to 6 holes with the first about 30 feet from the rich hole last drilled.
3. It takes approx 4 weeks from commencement of drilling to assay results for a particular hole.
4. Area to be drilled is open at depth and to the SE
5. In the fall they hope to access another rig to drill other zones.