Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Pacific Rim Mining Corp PFRMF



GREY:PFRMF - Post by User

Bullboard Posts
Post by Birpind1on Dec 13, 2006 9:38am
281 Views
Post# 11858280

More good drill results

More good drill results December 13, 2006 - 9:20 AM EST close Email this News Article Your Name Your Email Friend's Name Friend's Email Receive Copy: yes PMU:CA 1.30 0.00 Today 5d 1m 3m 1y 5y 10y VANCOUVER, BRITISH COLUMBIA--(CCNMatthews - Dec. 13, 2006) - Exploration drilling at Pacific Rim Mining Corp.'s ("Pacific Rim" or "the Company") (TSX:PMU)(AMEX:PMU) El Dorado gold project in El Salvador has yielded additional bonanza gold grades in the newly discovered Balsamo gold zone, where drill hole P06-494 intersected 25.7 g/t gold and 248 g/t silver over 5.6 meters true width and hole P06-502 intersected 30.9 g/t gold over 1.45 meters true width. A complete list of the most recent drill results is provided below. The Balsamo gold zone is located roughly 500 meters east of the South Minita gold deposit in a vein that runs parallel to the main Minita structure. With the latest results presented below, the Balsamo zone has been intersected over a strike length of 225 meters and a vertical range of over 100 meters and remains open. The Balsamo gold zone is one of three new gold discoveries the Company has made on the El Dorado gold project over the past 3 months. Significantly, all three of these discoveries (which include the Los Jobos and Deep Minita zones in addition to Balsamo) are located near the proposed infrastructure for the Minita and South Minita deposits, which are the subject of the Company's bankable feasibility study currently in progress. Readers are directed to the Company's website www.pacrim-mining.com and SEDAR filings www.sedar.com for details of the El Dorado resource and reserve calculations, and complete National Instrument 43-101 disclosure. The Company also reports that it has been granted a permit to conduct a drill program on its south El Dorado project claims by MARN, the El Salvadoran Environmental and Natural Resources Ministry. The south El Dorado project area hosts a number of high priority targets that the Company has identified over the past two years including the southern extensions of the Minita vein structure, the Nance Dulce area, and the Hacienda and Gallardo vein structures. All of these targets contain gold grades at surface and with the exception of a short successful drill program on Nance Dulce in 2004, have never been tested at depth. The south El Dorado drill targets represent excellent additional blue sky potential for the El Dorado project, and a drill program will commence on these targets in early 2007. "We are very excited about the results recently generated at our El Dorado program since our return to exploration drilling several months ago," states Tom Shrake, President & CEO. "The Los Jobos, Balsamo, and Deep Minita discoveries are encouraging because they represent the potential to add additional ounces to the established 1.2 million ounce measured and indicated resource at El Dorado. These new discoveries are in the vicinity of the Minita and South Minita deposits, which may have implications to their accessibility and economic viability, should resources eventually be defined at any or all of them. We are especially excited by the Balsamo discovery as the drill results it has yielded to date are particularly high grade. Furthermore, the Balsamo zone is in a separate structure parallel to the Minita vein (where the bulk of the resource ounces at El Dorado to date have been defined), which may have the potential to host a series of deposits similar to the Minita vein. On the permitting front, we are very pleased to have been granted our drill permit for the south El Dorado claim area and are eager to commence drill testing the high priority targets we have defined there over the past several years." Latest El Dorado Project Drill Results ------------------------------------------------------------------------- Drill hole UTM azi- From To Inter- True Vein North- muth/ (met- (met- sec- Wid- or ing/ dip ers ers tion th Sil- Hole System East- (degr- down down (met- (met- Gold ver No. Tested ing ees) hole) hole) ers) ers) (g/t) (g/t) ------------------------------------------------------------------------- P06-491 Minita 301199/ 085/ 533931 50 No Significant Results ------------------------------------------------------------------------- P06-492 Minita 301203/ 085/ 533947 50 No Significant Results ------------------------------------------------------------------------- P06-494 West Balsamo 300212/ 270/ 534851 50 325.85 332.55 6.70 5.60 25.66 248 ------------------------------------------------------------------------- incl- udes 325.85 327.35 1.50 1.25 31.32 281 ------------------------------------------------------------------------- and 327.35 327.45 0.10 0.10 305.44 2547 ------------------------------------------------------------------------- and 327.45 329.00 1.55 1.30 47.52 481 ------------------------------------------------------------------------- and 331.75 332.55 0.80 0.64 18.75 208 ------------------------------------------------------------------------- P06-496 Minita 301151/ 090/ 434414 52 36.00 36.10 0.10 0.10 94.54 165 ------------------------------------------------------------------------- 167.20 167.55 0.35 0.20 8.75 38 ------------------------------------------------------------------------- 303.50 303.60 0.10 0.10 9.06 28 ------------------------------------------------------------------------- P06-497 Nueva Esperanza- 302622/ 090/ Los Jobos 534268 55 166.67 168.35 1.68 1.40 6.18 47 ------------------------------------------------------------------------- P06-498 Condem- 299974/ 270/ nation 535030 50 No Significant Results ------------------------------------------------------------------------- P06-499 Nueva Esperanza- 302623/ 090/ Los Jobos 534269 74 Results Pending ------------------------------------------------------------------------- P06-500 Minita 301151/ 105/ 534017 58 371.75 371.90 0.15 0.10 10.76 77 ------------------------------------------------------------------------- P06-501 Nueva Esperanza- 302575/ 090/ Los Jobos 534267 65 No Significant Results ------------------------------------------------------------------------- P06-502 Balsamo 300316/ 270/ 534853 50 150.70 152.25 1.55 1.45 30.96 60 ------------------------------------------------------------------------- 356.45 357.50 1.05 1.00 6.24 59 ------------------------------------------------------------------------- P06-503 Minita 301300/ 534030 Results Pending ------------------------------------------------------------------------- P06-504 Nueva Esperanza- 302466/ 125/ Los Jobos 534243 50 No Significant Results ------------------------------------------------------------------------- P06-505 Minita 301300/ 090/ 534030 55 71.15 73.05 1.90 1.80 29.12 ------------------------------------------------------------------------- 136.70 140.90 4.20 2.60 14.97 ------------------------------------------------------------------------- 279.45 288.65 9.20 4.50 10.40 ------------------------------------------------------------------------- P06-509 Nueva Esperanza- 302728/ 090/ Los Jobos 534360 75 162.05 162.20 0.15 0.15 9.27 ------------------------------------------------------------------------- 166.05 167.60 1.55 1.00 11.32 ------------------------------------------------------------------------- About Pacific Rim Mining Corp. Pacific Rim is a growth-oriented, revenue-generating, environmentally and socially responsible gold exploration company with operational and exploration assets in North, Central and South America. The Company is expanding and developing its advanced-stage, high grade El Dorado gold project in El Salvador and is actively exploring a pipeline of grassroots gold projects. Pacific Rim's goal is to become a low cost, intermediate level gold producer. On behalf of the board of directors, Thomas C. Shrake, President and CEO NI 43-101 Disclosure Pacific Rim's exploration work on the El Dorado project is supervised by William Gehlen, a Certified Professional Geologist with the AIPG (No. 10626), an employee of Pacific Rim and a Qualified Person as defined in NI 43-101. Mr. Gehlen has verified that the results presented above have been accurately summarized from the official assay certificates provided to the Company. Pacific Rim's sampling procedures follow the Exploration Best Practices Guidelines outlined by the Mining Standards Task Force and adopted by The Toronto Stock Exchange. Samples have been assayed using fire assay with a gravimetric finish on a 30-gram split. Quality control measures, including check- and sample standard-assaying, are being implemented. Samples were assayed by Inspectorate America Corporation in Reno, Nevada USA, an ISO 9002 certified laboratory, independent of Pacific Rim Mining Corp. The July 2006 El Dorado resource estimate was prepared by Mr. Steve Ristorcelli, P.Geo. of Mine Develoment Associates, Reno, Nevada. Mr. Ristorcelli is an independent Qualified Person as defined in NI 43-101. The resource estimate conforms to current CIM Standards on Mineral Resources and Reserves. A technical report in support of the updated El Dorado resource estimate presented above was filed with SEDAR on July 31, 2006. The report was co-authored by Mr. Steve Ristorcelli, P.Geo. and Mr. Peter Ronning, P.Eng., each of whom are independent Qualified Persons as defined in NI 43-101. The January 2005 El Dorado pre-feasibility study is supported by a technical report prepared for Pacific Rim Mining Corp. by SRK Consulting (US) Inc. of Denver Colorado, entitled "Pre-Feasibility Study, El Dorado Project, El Salvador", dated January 21, 2005, and publicly available on SEDAR (www.sedar.com). The primary author of the report is Mr. William F. Tanaka, a Qualified Person independent of Pacific Rim, as defined in NI 43-101. Mr. Tanaka is a member of the Society of Mining Engineers (SME) and the Australasian Institute of Mining and Metallurgy (mAUSIMM).
Bullboard Posts