RE: Drill Results?EReal,
Yes - we are waiting on Drill Results at Copala - 35 Holes!
This stock is so tightly held, any good news will see us well over $2 in my opinion.
smilewithme
https://www.silverstonecorp.com/news/index.php?&content_id=21
Phase II 3,600 Meter Drill Program Planned for Copala
October 11, 2006
These results from the Phase I and Phase IA drill programs have encouraged Silverstone management to proceed with a Phase II drill program at Copala. The Phase II program will explore beneath and peripheral to historic workings in the following 5 sectors of the Animas Refugio vein: Clavo San Francisco, Clemens, El Muerto, Clavo Cantil, and San Carlos. The first four of these sectors occur within a 1 km long section of the Animas Refugio vein that strikes NW. This section of the vein starts about 300 m SE of the Mariposa mine which is currently in production on the adjacent property. A longitudinal section showing drilled and proposed holes for the Clavo San Francisco – Clemens section of the Animas Refugio vein is presented on the website www.silverstonecorp.com. The Phase II program is planned at 3,600 m of HQ core distributed between approximately 35 drill holes. A core rig from Major Drilling is expected on site in October.
https://www.silverstonecorp.com/news/index.php?&content_id=21