INFO comparison Granby and Bard´s results.Is recived by reading the companys comparisons report on LONE PINE Molebdynum project. Drillings made by Granby Corporation 1978 is compared with Bard´s first 2 holes drilled on the property 2007.
/www.bardventures.com/s/NewsReleases.asp?ReportID=176217&_Type=News-Releases&_Title=Lone-Pine-Molybdenum-Property-Update Target=_new>Granby VS Bard´s Important excerpt from this reading is printed below.
Vertical percussion hole number M3 intersected 0.176% MoS2 over 36.6 m from a downhole depth of 24.4 m to 61.0 m (final hole depth) which included a higher grade interval of 0.30% MoS2 over 18.3 m from 24.4 m to 42.7 m My interest in this info is directed to the grades and depth wich are ended in mineralization
(final hole depth) and my belief is that if the hole was drilled down to target depth
(500m) then the picture on what could be a great resource/reserve on the
LONE PINE project would be clearer,by this i just want to point out that the potential of hitting higher grades in these holes and all the way down is very large. Do your own Due Dilligence always,and as i said before. IF SPROTT IS INTERESTED IN PUTTING MONEY INTO CBS.V SO AM I
Regards IzY