I went back and re read yesterday's PR. The 211/22a-7 well is in Central Causeway (Antrim 65.5%) and is located 1 km southwest of the 211/22a-6 discovery announced earlier this month, which tested a combined flow rate of 6,300 barrels of light oil per day.
Drilling operation is expected to take approximately 30 - 40 days, so TD looks like it'll occur mid-August. It targets the Middle Jurassic Brent Group of sandstones. TD is approximately 12,500 ft (3,810m). That means Tarbart, Ness and Etive are involved.
A decision regarding whether it will be necessary to test the 22a-7 well or case it immediately for future production will be taken based on electric log data once the well has reached target depth.
The third well in the planned program will be drilled immediately following the completion of drilling operations on 22a-7 and is designed to appraise the 211/22a-3 discovery made in 1984 which tested up to 5,500 bopd from the same sequence of Brent sandstones in the southwest fault compartment of the Causeway structure.
Per the investor presentation, that third well is in the SW Causeway compartment. The presentation shows it linked to the two central causeway wells when they are placed on production.