RE: anyone else bullish? we feature FRP againi am still bullish and here is why.the area that was just reported on in the last news release looks like this: 350m x 325m x10m x 2.6 gravity = 2.960,000 tons x .72lbs. x 1.2 = 2,555,280 lbs. x 130$ =332,186,400$$$$. this is from a small area in the total picture and remember it costs less than 10$ per ton to mine and leach.