Iciena CURRENT AFFAIRSI noticed that more information is being uploaded to Iciena's website since the news release. I grabbed a few thinks to post here that I thought where interesting.
---------
Paranatinga claims location and generalized geologic map - notice the drill holes specified. More results to add to the `pending file`
.
.
.
.
.
Different size fractions from the recovered bulk 400kg sample
.
.
.
.
.
Helicopter VTEM survey (Image courtesy: Geotechairborne Ltd.)
.
.
.
.
.
Based on the encouraging reports from the 2003 - 2005 geophysical and field campaign, the 2007 campaign opened up with the acquisition of new geophysical datasets to help narrow down the areas with best mineralization characteristics. The survey flown in early 2007 was the helicopter-borne limited VTEM system flown at 100m spacing to help refine previous airborne magnetic surveys. The use of helicopter-borne time domain EM technology world-wide has expanded significantly in the last five year for two primary reasons; power (or enhanced signal/noise) and excellent spatial resolution that is inherit with helicopter systems helping minimize the number of false-anomalies and noisy magnetic data in a more complex terrain to the west. The preliminary VTEM data are currently undergoing ground evaluation, but at this stage confirm and reinforce some of the previously observed anomalies.
.
.
.
Preliminary anomalies noted on 2007 VTEM data acquired over the area.
.
.
.
.
.
Items highlighted in RED are identified as high priority targets for DRILLING
.
.
.
The primary purpose of the survey is to identify potential diamond-bearing kimberlite bodies in preparation for drill testing. Initial processing of the geophysical data identified 29 high-priority kimberlite targets, which exhibited both a magnetic and conductive response. The targets range is size from 40 to 300 metres in diameter. Geophysical processing will begin to identify and refine potential individual kimberlitic target characteristics.
.
.
www.iciena.com