Project construction began in January 2001. Construction of the A154 dike was completed in July 2002, and de-watering of the A154 pit area began. The A154-South pipe entered production in January 2003. Production to Sept 30, 2003 totaled 2.7 million carats. As of June 2003, total proven reserves for the four main pipes stood at 13.5 million tonnes grading 4.6 c/t for 61.7 million carats, and additional probable reserves stood at 12.2 million tonnes grading 3.7 c/t for 44.9 million carats.