OTCQX:PALAF - Post by User
Comment by
wanneon Oct 30, 2007 11:11am
265 Views
Post# 13716719
RE: Latest news on Bigrlyi (41.7% Paladin)
RE: Latest news on Bigrlyi (41.7% Paladin)this indeed looking great !
Importantly, the recognition of significant uranium mineralisation in holes drilled outside of
current resource envelopes reinforces Energy Metals’ belief that a substantial increase in the
Bigrlyi resource will result from the current drilling program.
An economic scoping study encompassing and open pit optimisation, underground design
and whole project study on the Bigrlyi deposits is nearing completion with reportable results
expected mid November. Preliminary design and costing of the milling process, open cut and
underground mine design and capital costing is complete.
A total 8 pits have been designed and optimised (A15 – 1, A4 – 6, A2 – 1) with underground
design work complete at Anomaly 15 and Anomaly 4. It is anticipated that once the scoping
study results are finalised, a decision will be made shortly thereafter on the commencement
and scope of a full feasibility study. This Feasibility Study will be based on the completed
2007 drilling campaign and is expected to be on a substantially larger resource, which will
have further positive implications for the economics of the Bigrlyi project.