Some $$$ figures for youAssuming we get the 40 bbd for the first 2 holes + 3 more getting drilled at the same output, that will bring us 200 barrils of light sweet crude at app. $ 72.00
200 x 72 = $ 14000.00 p.day x let's say 350 days =$ 4,900,000.00
Now, this does not include the nat.gas which is soon to flow !!!
The pipeline is being installed as we speak.
With 25 mil.shares times a multiple of only 10 gives a $ 2.00 stock value.
Do your on math.
And there is more holes to be drilled and more property.
GLTA, K.H.