RE: News ReleaseNotice they posted core pictures on their web. Zones so far are highly pyritized. Hole 3 was drilled 120 m away from holes 1-2. Reasons for holes 1-2 having difficulty is the blocky material above. Which is the fault gouged and soft material in drill pictures.