developmentsDoes any one have an idea when the following information will be known about:
1. A 3 hole drill program at the Stony Rapids property is scheduled to begin in mid-January. The project is located within the Athabasca Basin along with its northern margin and has both geophysical conductors and geochemical anomalies which will be tested.
2. A program of overburden drilling and ground geophysics at our Peace River-Buffalo Head Hills diamond joint venture (50% Star Uranium Corp, 50% United Uranium Corp.) in Northern Alberta is scheduled to start at late January.
What is the normal time frame from drilling till results?
Thanks