Compression equipment.
Compression equipment.Last Sept.
The wells flowed-back methane almost immediately and during our last flow-test period, nitrogen levels were declining steadily and methane contents reached as high as 54%.
Now with permitted compression equipment Moose Jaw and Foam Lake wells have flow rates retested and move to the next stage. Does this mean that the equipment needs to be inplace for production and what new level are we looking for, 60-75-85%. Thanks
The doubling of reserves NR was released in Sept before the 14 drilled wells were complete at Moose Jaw. Cores from these 14 wells are being analysed staeside. The results haven't been released. What did they find and is the equipment permit approval a result of their discoveries.