103.5 metres of Visible Sulphides!!!!
GREAT NEWS. Better than the first release
Hole number 5.01-09 drilled southerly, 50 meters down dip below hole 5.01-08 encountered the main zone from 103.5 meters to 235.4 meters (103.5 meters in total) in the drill hole and is similar in visible sulphide content to Hole number 5.01-06.