GREY:COLUF - Post by User
Post by
stalwart1on Jul 31, 2008 10:20pm
217 Views
Post# 15350351
hole 17
hole 17hole number 17 is being drilled basically on the footwall of the pit i was sent the picture which shows the big pond formally known as the pit approx what looks to be 50 ft away, i will try and post it here if anyone is interested. I also learned about a multiple geologist study that was done 8 years ago regarding rodium values which were taken from undisclosed cvrd drill cores which returned as low as 2 grams per tonne and as high as 8 grams per tonne however there is a copyright on the document but still sounds great as rhodium is around the 9000/ ounce range right now. As most are aware we are now waiting upon the next set of assays which i have been led to believe will be 4 holes , only the lab knows when we will see thoses numbers but this does mean that we will enjoy multiple news releases over the next few months with what i believe will be stagerring grades. I took the opportunity to add another 10 in this slide and will be happy to take on more if the down trend continues however i dont see that happening good luck to all