RE: .35 and lower now
manpower for the rig- check Terroco Drilling - they are in need of personel for every position on a drilling rig- more machinery than manpower to operate. and possible directional drilling equipment/personel.
maybe delaying drilling until the completion is done on A5 to drill A6. cannot have 2 rigs working on the same location.
as far as the motor on the service rig it would take a couple of days to change out especially if they took the rig to their shop- did the rest of the equipment- pump,tank etc stay on the location while the SR was gone?
to many unanswered questions and nobody answers their phone- have tried calling Thor 2-3 times per day for the last week with no answer and no returning of calls.