Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Arctic Star Exploration Corp V.ADD

Alternate Symbol(s):  ASDZF

Arctic Star Exploration Corp. is a natural resource company. The Company is a diamond explorer engaged in the acquisition, exploration, and development of mineral properties. Its projects include Diagras Diamond Project and Timantti Diamond Project. Diagras Diamond Project is located in the north-eastern part of the prolific Lac de Gras kimberlite field, approximately 22 kilometers (km) north-northeast of the Diavik diamond mine and 36 km east of the Ekati diamond mine in the northwestern territories of Canada. Diagras Property consists of 58 contiguous claims with an area of approximately 48,346 hectares. The Timantti Project is located in Finland, approximately 17 km away from the town of Kuusamo. The Timantti project, owned 100% by the Company, consists of two Exploration permits, the 243 Ha Exploration Solavaara Permit and the 882 Hectares Vaimouso permit totaling 1125 Ha. The Project is also comprised of two Diamond Bearing Kimberlites: the Black Wolf and White Wolf Kimberlite.


TSXV:ADD - Post by User

Post by chumpismeon Nov 14, 2008 12:57pm
394 Views
Post# 15586735

strike length/depth extended.......

strike length/depth extended.......Mr. John Tait of WSR reports

METALEX-WSR-ARCTIC STAR 5.01 PROGRESS REPORT

WSR Gold Inc., Metalex Ventures Ltd. and Arctic Star Resources Inc.'s joint venture project, along the Ring of Fire in the James Bay Lowlands, are providing an update on exploration progress on Anomaly 5.01, located 45 kilometres north of Noront's Eagle One project.

The second phase of drilling at the 5.01 project is now complete and comprised 17 holes (DDH501-26 through DDH501-41 and DDH501-43) totaling 5,095.5m. To date drilling on the 5.01 project totals 10,785.9 meters.

A summary for the Phase 2 drilling program is presented in the table below.

    -------------------------------------------------------------------------    Hole No.   Local E  Local N    UTM e    UTM n  Azimuth      Dip   Length    -------------------------------------------------------------------------    DDH501-26   L1+80E    0+50N   522396  5901526      270      -49    198.0    DDH501-27   L1+80E    0+50N   522396  5901526      270      -77    163.5    DDH501-28   L1+37E    0+25N   522348  5901500      270      -45    108.0    DDH501-29   L2+35E     0+00   522433  5901475      270      -65    201.0    DDH501-30   L1+87E    0+50S   522399  5901425      270      -47    279.0    DDH501-31   L1+87E    0+50S   522399  5901425      270      -69    306.0    DDH501-32   L1+87E    0+50S   522399  5901425      270      -84    267.0    DDH501-33   L2+50E    0+75S   522460  5901400      270      -45    291.0    DDH501-34   L2+50E    0+75S   522460  5901400      270      -61    324.0    DDH501-35   L2+50E    0+75S   522460  5901400      270      -72    303.0    DDH501-36   L2+40E    1+25S   522456  5901344      270      -45    219.0    DDH501-37   L2+40E    1+25S   522456  5901344      270      -62    297.0    DDH501-38   L2+40E    1+25S   522456  5901344      270      -78    393.0    DDH501-39   L2+90E    1+75S   522510  5901300      270      -45    414.0    DDH501-40   L2+90E    1+75S   522510  5901300      270      -55    300.0    DDH501-41   L2+90E    1+75S   522510  5901300      270      -65    441.0    DDH501-43   L4+80E    0+25N   522690  5901500      270      -50    591.0    -------------------------------------------------------------------------

Complete assay results have not yet been received since the news release dated September 10, 2008. 21 batches totaling 719 samples have been sent to Actlabs from the Phase 2 drilling program.

The massive sulfide occurrence is still open up and down dip in areas, as drill holes failed to close off the upper or lower plunge of the deposit. The strike length has been extended to almost 200m, with a vertical depth extension of 275m from a near surface depth of about 10m. The width of the zone still varies from 3-22m, with an approximate average of 12-15m.Down hole electromagnetic geophysics as well as additional airborne magnetic and electromagnetic geophysics on east-west flight lines will be conducted over the 5.01 project claim. The results of these surveys as well as additional ground geophysical work should generate follow-up drill targets for February of 2009.Mr. Mike Kilbourne is the Qualified Person responsible for the technical contents of this press release.

WSR Gold Inc. (TSXV:WSR) ("WSR") is pleased to announce the appointment of Mr. Chris Hodgson as director of WSR.

Mr. Hodgson entered provincial politics in 1994 and following the 1995 general election was appointed as Ontario's Minister of National Resources and Minister of Northern Development and Mines. During his time as Minister, Mr. Hodgson was recognized for creating new opportunities and growth within Ontario's mining industry, as he introduced and proclaimed a new Mining Act. Chris has served as the President of the Ontario Mining Association since October 2004, has served as the President of Chris Hodgson Enterprises since 2000 and is currently serving as a trustee for the Brick Income Fund.

John Tait, President and CEO said, "WSR is pleased to welcome Mr. Hodgson to its Board and feel that Mr. Hodgson's experience in Ontario Mining and Exploration will be a great asset to our ongoing efforts."

Bullboard Posts