Drill results repostJust reposting the results because they are all out of sync in the first NR I posted.
SUMMARY OF SIGNIFICANT INTERSECTIONS
NICHOLSON MAIN SHOWINGDIAMOND DRILL PROGRAM
Hole No. LocationAzimuth Dip Length (m) From (m) To (m) Grade (g/t)
N-1-09 0+10W 0+30N 190 -46 0.80 22.40 23.20 3.79
N-3-09 0+50W 0+33N 225 -47 1.50 10.10 11.60 6.37
N-4-09 0+75W 0+40N 252 -60 0.76 26.06 28.82 5.49
N-7-09 0+50W 0+35N 225 -70 0.30 15.85 16.15 12.82
N-9-09 0+50W 0+35N 244 -70 1.82 25.91 27.89 1.72
N-10-09 0+50W 0+30N 190 -47 1.83 14.93 16.76 3.02
N-11-09 0+50W 0+30N 190 -70 0.46 24.53 24.99 1.99
N-13-09 1+50W 0+43N 258 -52 0.91 28.50 29.41 12.04
N-25-09 3+25W 0+39N 255 -67 0.60 46.02 46.62 1.94
N-26-09 2+40W 0+85N 225 -55 0.46 49.44 49.90 298.43
N-29-09 0+44W 0+85N 225 -68 1.52 57.00 58.52 3.70
N-30-09 1+50W 0+61N 186 -56 1.52 39.47 40.99 9.94