So what are they trying to say ?Canasia ) wishesto announce that it has been notified by its partner that theapplication has been completed for an initial bulk sample operation onthe Clone Gold Prospect. Approximately ten tons of samples havebeen gathered to date and were shipped for processing.
First they say the application has been completed. Do they mean they still have to get it approved ?
Then they say 10 tons were shipped.
You people do realize 10 tons is less than one gravel truck load of dirt.
The size of the dump box (example if it can hold 10 cubic yards) andthe legal loading limit for the roads / area and number of axles thetruck has will determine the load it can carry. But let's say it canhold 10 cubic yards for this example. Gravel weighs approx 1.35 tonsper cubic yard. So a 10 cy load would weigh 10 x 1.35 tons = 13.5 tonsof gravel.