Testing L53 & BR-2ST2 - What to expect?Press Release from 16th of December:
L53-A Exploration Well (100% WI and operator)
Upon completion of testing operations on the secondary volcanic objective, the zone will be isolated with a bridge plug and testing will commence on the lowermost main objective sandstone reservoir where over 40 meters of measured thickness net oil pay was interpreted on logs and confirmed by RFT pressure gradients.
L53-D Exploration Well (100% WI and operator)
The L53-D exploration well, located approximately 8.4 kilometers west of the L53-A discovery on a separate structural closure is currently setting intermediate casing at a depth of 560 meters, just above the multiple sandstone reservoir objectives. Free oil was observed at surface on samples from a depth of approximately 550 to 560 meters. The well is anticipated to be completed drilling in approximately seven days, at which time testing operations will commence if justified by wire line logging.
BR-2ST2 Horizontal Appraisal Well (60% WI and operator)
The BR-2ST2 horizontal appraisal well has just completed the drilling of approximately 350 meters of horizontal section within the main volcanic reservoir objective. This is the third horizontal well to be drilled at Bo Rang "B" field and testing operations are anticipated to commence in the next three days.
As you see there where a few things to be done before testing started + a christmas break. I believe the test can be ready by the end of this week or early next week.