RE: MD&A Info: Gold being Mined currentlySorry, bad math. But MUCH BETTER:
Assume the average gold/tonne is 1.45g/tn based on the two numbers above.
Processrate today:
--> 1500 tn/day (1.45g * 1500tn/day = 2175 grams/day or77 oz/day).
-->This equates to 539 oz/week.
-->This equates to 28,028 oz per year (assuming production 7d/week, 52 weeks/yr)
Am I right on my math? Anyone have other thoughts?
B