RE: RE: RE: Weather Hampering Nag'S Production
This Statement.... The production rate and mine-life projections have been made without support of a feasibility study, there is no certainty the proposed operations will be economically viable
Means nothing ... You can either start up with or without a feasibility study done ... Even if you have a feasibilty study done, it does not gaurantee that the mine will be successful ... And if you chose to not have one done does-not mean the mine will be a failure... Maybe they didn't do one because this was a no brainer and why waste the money....
Last night when I checked the weather down there it was over cast temp was -10.c overnight to +1-2 during the day long range was +3-4 over night and +10-12 during the day so weather I think is starting to become a none issue...GLTA