SQI Exploration (Spring-Early Summer)SQI Exploration (Spring-Early Summer)
Davidson property (Blackwater Project)
RVC has started Phase 1 of their 25,000 m drill program on April 6, 2010. The Phase 1 drilling plan comprises approximately 10,000 m of core drilling (20 holes) to test for possible extensions of the mineralization to the northwest, southwest, south and east of the deep discovery hole (BW59: 329 m @ 1.25 g/t Au). These holes will be drilled vertically to depths of 500 to 600 m from the surface.
Capoose Project
SQI is planning extensive diamond drilling at Capoose to enhance and further define the NI 43-101 inferred resource of 1,32 million oz of AuEq. or 53 million tonnes at a grade of 0.77 g/t AuEq. This season's program will include over 10,000 m of resource definition drilling, consisting of approximately 35 drill holes with depths ranging between 250 and 300 m. Drilling will be completed in a grid pattern across the south end of the deposit, to infill the central portion of the deposit area and test for extensions of the deposit to the south. SQI also plans on drill testing several geophysical and geochemical targets in other areas on the property. The 2010 drill program starts around mid May.
3Ts Project
Simultaneously, a 5,000 m drill program will take place at the 3Ts Project. The drill program starts around mid May.
Guy