RE: RE: Power issue resolvedI attached the wrong link last time but the power plant is all part of the construction plan. A small diesel genset at 1megawatt would certainly do the job but eventually they probably increase to over 20mw. Once the power lines get there, if they do, MPV / DB will be able to sell excess power to the grid.
cb