Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Antioquia Gold Inc AGDXF

Antioquia Gold Inc. is a Canada-based company gold exploration and development company. The Company’s primary focus is the operation of its Cisneros underground gold mine located outside Medellin Colombia. The Company’s flagship project is Cisneros project in Antioquia, Colombia. The project is located in the central portion of the department of Antioquia, roughly 55 km northeast of Medellin. The project is comprised of 10 concessions totaling 5,630 hectares. The project hosts a structurally controlled mesothermal lode gold system. The Company’s exploration projects in the vicinity include AngloGold Ashanti/ B2Gold (Gramalote Project), Colombian Mines/Arturus Ventures (Nus Project), Sol Vista (Guatalupe Project), Red Eagle (Pavo Real Project) and CuOro (Santa Elena Project). The Company’s subsidiaries include Antioquia Gold Ltd., AGD Colombia (branch of AGD Barbados), and Ingenieria y Gestion del Territorio S.A.


GREY:AGDXF - Post by User

Bullboard Posts
Post by nicklebacksuckson Apr 28, 2010 1:16pm
672 Views
Post# 17040273

news

news
Antioquia drills 11 holes at Cisneros
Ticker Symbol: C:AGD
Antioquia drills 11 holes at Cisneros
Antioquia Gold Inc (C:AGD) 
Shares Issued 64,683,205
Last Close 4/23/2010
.30
Wednesday April 28 2010 - News Release
Ms. Sheri Torske reports
ANTIOQUIA GOLD DRILLING AND EXPLORATION UPDATE CISNEROS AREA COLOMBIA
Antioquia Gold Inc.'s drilling continues to intersect and expand previously discovered mineralized structures on its Cisneros project in Colombia.
Antioquia continues its Phase 2 - 10,000 meter (32,800 ft.) drilling program, as reported on March 17, 2010 (available on SEDAR or at company website). To date Antioquia has drilled 11 holes for approximately 1,500 meters (4,900 ft.) on the Guaico-Nus Prospect.
The first 6 holes of the Phase 2 program intersect the Guaico north-south structure, the same structure encountered in the Phase 1 drilling program. There are now 8 drill holes and one artisanal working on the Guaico north-south structure which continues to remain open to the north and at depth.
The next 5 holes of the Phase 2 program intersect the Nus east-west structure, which was previously identified in drillhole PC09-22 from the Phase 1 drilling program. Antioquia has now drilled 9 holes into the Nus east-west structure which remains open to the east, west and at depth.
Initial assay results are expected to be available for reporting in the first half of May. However, the Phase 1 drilling program reported that drillhole PC09-20 had a drilled thickness of 6.91m at 15.73 g/t gold (22.7 ft at 0.51 ounces per tonne) in the Guaico north-south structure.
Antioquia continues its regional geology exploration on the remaining 5,000+ hectares (12,400 acres) of the Cisneros Project.
In July 2009, a grab sample that assayed 74.6 g/t gold was retrieved from the Mina Sur America prospect located in the north-east section of the Santo Domingo Joint Venture which is approximately 3 kilometers north of the current Phase 2 drilling program. In February 2010 Antioquia geologists returned to the Mina Sur America prospect and collected 14 hand channel samples which provided an average grade of 23.5 g/t gold.
In March 2010 a previously unknown artisanal working named Mina Papi was encountered within the newly acquired Pacho Luis land block just west of the current drilling on the Guaico-Nus prospect. Six hand channel samples were collected with an average grade of 6.19 g/t gold.
Antioquia is currently designing detailed mapping, ground geophysics and soil sampling programs to trace both the Mina Sur America structure and the Mina Papi structure, with preliminary plans to drill the areas toward the end of the current Phase 2 drilling program.
As part of its aggressive exploration program and to help identify high potential areas, on April 19, 2010 Antioquia commenced an in-house 60 line-kilometer (approximately 40 line-miles) ground magnetometer survey in the Guayabito and Manuela-Guaico-Nus area. This geophysics survey program has as its goal to delineate key structures, to define continuity between these structures, to guide the current drilling program and to develop new drill targets on the Cisneros Project.
The regional geochemistry program continues with samples being collected from soil sampling grids in the Guayabito and Manuela-Guaico-Nus areas to augment structural mapping.
Antioquia is encouraged by the Phase 2 drilling program as it continues to encounter on step-out, the mineralized shear zones identified in the 2009 Phase 1 program. The two structures currently being drilled continue to provide optimism with regard to the enlargement of the areas of mineralization. As we are discovering through the first 1,500m, these structures are remaining open in various orientations and open at depth.
Positive results from two artisanal workings and the ongoing geophysics and geochemistry work continue to identify new prospects and drill targets.
© 2010 Canjex Publishing Ltd.
Bullboard Posts