NEWS!Mountain Lake to start drilling at Valentine Lake$$$$$
Highlights:
> 8,000 metres of drilling to start in late May
> A detailed IP survey, followed by trenching and drilling, will be carried out along the 2 km structure that hosts the Leprechaun Gold Deposit and the Sprite prospect as well as within the Valentine East prospect located 13 km along strike to the northeast
> Multiple gold showings throughout the 30 km long property will also be evaluated .
https://www.stockwatch.com/newsit/newsit_newsit.aspx?bid=Z-C%3aMOA-1720250&symbol=MOA®ion=C
This is one aggressive drill program.
Cheers,
JR.