TSXV:AAA.P - Post by User
Post by
str8tgoodson May 18, 2010 9:16am
188 Views
Post# 17108580
2nd Drill to Accelerate Drill Program
2nd Drill to Accelerate Drill ProgramI love it when they send in a 2nd drill. Usually means there is something worth going after, otherwise why accelerate things. Now is it safe to say instead of 3 months to finish the first phase of drilling, can it be completed within 2 months? I thinks so.
"We intend to report the assay results from the first two holes immediately after they are received, and we also intend on accelerating the drill program by bringing in another drill rig. Allana is getting quotes on a seismic program that is planned to be launched as soon as seismic equipment can be mobilized."