anyway
Anyway, I bought a bit more ER today so I'm locked and loaded and ready for the 43-101. I believe it is supposed to be early in July.
When the subject of the 43-101 came up Dr. Don pointed to his briefcase and said the calculations were in there, but they need to go through the checking process, I believe he indicated one of that verifications is the analysis by that 3rd party firm.
Pardon the redundancy because I think someone else mentioned this same point on a recent post after they talked to Dr. Don.
Anyway, I think we will get the big news within about a month.